You can marginally reduce the overall cost of the project by avoiding ill-conceived runs if you carefully plan your work beforehand. You will then decide where the switching needs to originate from-are you going to u se an already existing switch or, if it’s to be a new install, how much wire will you need to reach the electric panel and how much more to reach the closest light fixture of the new circuit. Knowing the rating and the number of fixtures you plan to install will let you determine the combined maximum power of all the fixtures so that a properly sized breaker and wiring can be decided upon-as halogen and incandescent lights consume much more power than LED lights and can let you downsize from 20 amps to a 15 amps circuit. Shop around and decide on the type of fixtures you want. Using painter’s tape to temporarily mark the location of each fixture will give you the opportunity to shift some of them while selecting the proper spots, without leaving any unnecessary markings on the ceiling. Whatever the objective when you install a “string” of lights overhead, the very first step is to determine which areas are to be illuminated by that specific circuit and how many fixtures will be required with their ideal locations to ensure proper illumination coverage. 1 - Planning the Layout Step 1.1 - Pick Locations Don't try it unless you have professional skills. Safety Note: Electrical work is dangerous.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |